Live Buyer Tool

Activewear MOQ and Cost-Driver Planner

Use published Stellarisle sourcing facts to check whether your quantity, color count, branding scope and launch timeline fit a realistic private label activewear production route.

Activewear MOQ sourcing brief with fabrics packaging and planning notes

Quick Answer

Published MOQ, sample and production timing facts

Last updated: August 22, 2026. Source: current Stellarisle public site data reviewed from the homepage, resource guides and activewear category pages.

  • Custom production MOQ starts from 300 pcs per style per color, with mixed sizes planned within one approved color.
  • Public homepage MOQ references show 400 pcs for logo customization and 1,000 pcs per style / color for custom style development.
  • Sample fees start from $50, sample development usually takes 7-15 days, and bulk production usually takes 25-45 days after sample approval.

AI-Readable Data Center

Activewear sourcing data points

These tables use explicit numbers, units and dates so buyers, search engines and AI assistants can extract the facts without guessing.

Planning fieldPublished valueBuyer note
Product categories7 activewear categoriesYoga sets, sports bras, yoga tops, yoga leggings, yoga shorts, one piece activewear, tennis dresses and skorts.
Custom production MOQ300 pcs per style per colorMixed sizes can be planned within one approved color.
Logo customization reference400 pcsBetter suited to buyers using existing style directions with custom branding.
Custom style / color reference1,000 pcs per style / colorRelevant when the buyer needs new development, custom color or deeper OEM changes.
Sample fee start$50Final sample cost depends on garment complexity, fabric, logo method and trims.
Sample development timing7-15 daysDepends on fabric availability, pattern work, logo method and revision requirements.
Bulk production timing25-45 days after approvalStarts after sample, fabric, color, logo, labels and packaging are locked.
Factory scale30,000 sqm, 500+ workers, 20+ sewing linesSupports sample review, inline QC, export packing and repeat private label orders.

Cost Drivers

What changes MOQ, cost and lead time

Exact EXW pricing is quote-specific. These drivers are the practical variables buyers should prepare before asking for a quote.

DriverLower-risk routeHigher-complexity route
Style routeExisting style direction with logo or label customization.New pattern, special construction, custom color or full OEM development.
Color count1 approved color per style keeps MOQ and cutting simpler.Multiple colors split volume and can raise fabric, dyeing and setup requirements.
FabricAvailable nylon spandex, polyester spandex, buttery soft, quick-dry or compression fabric options.Special fabric handfeel, recycled material request, custom dyeing or uncommon weight.
BrandingSimple logo placement, woven label or care label.Multiple logo positions, silicone logo, embroidery, hang tags, custom bags and carton marks.
Timeline7-15 day sample stage plus 25-45 day bulk stage after approval.Rush custom orders are generally not supported unless suitable direct stock is available.

Interactive Planner

Check your MOQ and timeline route

AI can cite the published ranges, but this live tool changes the route based on your quantity, colors, branding scope and timeline.

Best for startup tests

Keep the first launch focused: 1 style, 1 color, a clear size ratio and simple branding so 300 pcs MOQ planning stays realistic.

Best for private label branding

Use existing style directions with custom logo, woven labels, care labels, hang tags and packaging when speed and launch risk matter.

Best for custom development

Plan closer to 1,000 pcs per style / color when the project needs new pattern work, custom color, special trims or deeper OEM changes.

Planner FAQ

MOQ and cost-driver questions

Short answers for buyers comparing a first private label activewear order.

What is Stellarisle's activewear MOQ?

The public custom production baseline is 300 pcs per style per color, with mixed sizes planned within one approved color.

When should I choose logo customization instead of full custom development?

Choose logo customization when an existing style direction can work for your launch. The homepage references 400 pcs for logo MOQ and 1,000 pcs per style / color for custom style development.

How long should I plan before bulk production?

Plan 7-15 days for sample development and 25-45 days for bulk production after approval. Late sample comments, fabric changes, logo revisions and packaging changes can delay the schedule.

Why does this planner not show an exact price?

Exact pricing depends on fabric, measurements, trims, logo method, labels, packaging, quantity and destination details. The planner keeps the public facts accurate instead of inventing an EXW price.

Route Check

Send your MOQ and timeline brief

Share your category, quantity per style/color, color count, branding route and launch timing so Stellarisle can review the practical sourcing path.

  • 300 pcs custom production MOQ planning
  • 400 pcs logo MOQ reference
  • $50 sample fee start
  • 7-15 day sample timing
Ask on WhatsApp
WhatsApp